My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-04_PERMIT FILE - M2022013 (38)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2022-04-04_PERMIT FILE - M2022013 (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 8:40:20 AM
Creation date
4/4/2022 4:49:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
4/4/2022
Doc Name Note
Exhibit G - Flood Control Mitigation Plan
Doc Name
Application
From
Varra Companies, Inc.
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Two Rivers Gravel Pit Mine <br /> Riverside Berm Failure Analysis <br /> and Flood Control Mitigation Plan <br /> 7ech"olooicess January 22,2020 <br /> I. INTRODUCTION <br /> Varra Companies, Inc is interested in mining the Two Rivers property (Site), located between the <br /> Big Thompson and South Platte Rivers just upstream from their confluence, for gravel mining. <br /> As part of the extraction plan, a riverside berm width needs to be determined that is sufficient to <br /> prevent head cutting/erosion from capturing the river, but not in excess so that extraction can be <br /> maximized. Site-specific analyses were performed that adopted WinDAM C (National Resource <br /> Conservation Service, 2016), a dam-breach erosion model, for estimating head cutting/erosion <br /> from a 100-yr flood including head cut length, depth, width, and head cutting time progression. <br /> II. SITE DESCRIPTION <br /> 2.1 Location and Size <br /> The Site - approximately 232.7 acres in size—is located between the Big Thompson and South <br /> Platte Rivers just upstream from their confluence (Figures 1 & 2). It consists of three fields— <br /> Central, Northwest, and Northeast(154.3, 54.9, and 23.5 acres, respectively)that will be mined <br /> in succession. Planned extractions volumes for Central, Northwest, and Northeast Fields are <br /> 5,665, 1,648, and 659 acre-ft, respectively. <br /> pg.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.