Laserfiche WebLink
Two Rivers Gravel Pit Mine <br /> Riverside Berm Failure Analysis <br /> and Flood Control Mitigation Plan <br /> ' ' ' January 22,2020 <br /> TWO RIVERS <br /> FILL TIME ESTIMATES <br /> CENTRAL PIT <br /> Inc GW Inflow Rate- GW Inflow Rate- River Inflow- Cummulative Elevation <br /> Pit Depth Pit Elev Pit Vol Volume GW Inflow Rate Ave Ave HG Time Ave River Inflow Total Inflow Inflow Volume Inflow Volume (ft) <br /> (af) (af) (af/day) (af/day) (af/hr) (hr) (cfs) (af/hr) of/hr (af) (af) <br /> (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (14) (15) <br /> 0 4688.0 5,665 0 459 5,158 215 48 12,600 1,041 1,256 15068 27856 <br /> 10 4678.0 4000 1,665 2,633 5,158 215 36 10,300 851 1,066 12788 20455 <br /> 20 4668.0 2300 1,700 4,443 5,158 215 24 9,000 743 958 7667 12029 <br /> 30 4658.0 600 1,700 6,252 5,158 215 16 4,000 330 545 4363 8064 <br /> 5,158 215 12 3,000 248 463 3702 6743 <br /> 5,158 215 10 2,000 165 380 3041 4396 4682.0 <br /> 32 4656.0 0 600 9,858 5,158 215 8 1,500 124 339 1355 1868 4667.0 <br /> 5,158 215 4 500 41 256 512 748 4660.0 <br /> 5,158 215 2 250 21 236 236 459 4657.5 <br /> 5,158 215 1 100 8 223 223 223 4657.0 <br /> 5,158 215 0 0 0 4656.0 <br /> NOTES <br /> (1) Pit depth increments arbitrarily chose 10 ft. Pit depth from Joby analysis: (C:\DATA\Flow Tech nologies\Projects -FT\Varra\FT1910 -Two Rivers\H&H\GW Inflow-Joby). <br /> (2) Based on (1). Based on (1). El 4688 from Existing Topo,fn =C:\DATA\Flow Tech nologies\Projects-FT\Varra\FT1910 -Two Rivers\Drawings\Existing Topo.pdf. <br /> (3) From Brad Jones email 10/26/19, "update on individual extraction volumes." Email file also in, C:\DATA\Flow Tech nologies\Projects-FT\Varra\FT1910 -Two Rivers\H&H\Pit <br /> Volume, Fill Time\Two Rivers. Max volume computed from cubic yards, and other volumes extrapolated. <br /> (4) (4) minus (3). <br /> (5) From Joby analysis: (C:\DATA\Flow Technologies\Projects-FT\Varra\FT1910 -Two Rivers\H&H\GW Inflow -Joby). Mid-values extrapolated. <br /> (6) Average of 459 and 9,858. Average because no way of knowing inflow at times and water surface elevations of inflow HG, so average of high and low is reasonable. <br /> (7) (6) converted to of/hr so fill times can be computed in hours per(12). <br /> (8) & (9) From, C:\DATA\Flow Tech nologies\Projects -FT\Varra\FT1910 -Two Rivers\H&H\WinDAM C Inflow HG. <br /> **Note. It is assumed that 2/3 inflow floodplain HG enters Central Pit. <br /> (10) (9)*0.0826. <br /> (11) (7) +(10) <br /> (12), (13) Fill time for use in comparing fill time with head cut depth. However, it doesn't give pit water surface elevation. <br /> (14) From, "TWO RIVERS DESIGN HYDROGRAPHS (WINDAM C INPUT HGs) FOR REPRESENTATIVE HEADCUT AT BIG THOMPSON SIDE AND SOUTH PLATTE SIDE PITS." <br /> (14, (15) Cumulative volume for use in obtaining elevation from elevation-storage curve ((2), (3)). <br /> pg. 30 <br />