My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-04_PERMIT FILE - M2022013 (38)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2022-04-04_PERMIT FILE - M2022013 (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 8:40:20 AM
Creation date
4/4/2022 4:49:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
4/4/2022
Doc Name Note
Exhibit G - Flood Control Mitigation Plan
Doc Name
Application
From
Varra Companies, Inc.
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Two Rivers Gravel Pit Mine <br /> Riverside Berm Failure Analysis <br /> and Flood Control Mitigation Plan <br /> 7ech"olooicess January 22,2020 <br /> TABLE OF CONTENTS <br /> DISCLAIMER 3 <br /> ABSTRACT 4 <br /> PURPOSE 5 <br /> I. INTRODUCTION 6 <br /> II. SITE DESCRIPTION 6 <br /> III. STUDY METHODOLOGY 9 <br /> IV. RESULTS 15 <br /> IV. MITIGATING MEASURES 21 <br /> VI. WATER SURFACE PROFILE FOR SOUTH PLATTE RIVER ALONG 21 <br /> CENTRAL PIT <br /> VII. SUMMARY AND CONCLUSIONS 23 <br /> REFERENCES 24 <br /> APPENDIX 25 <br /> LIST OF FIGURES <br /> Figure 1. Two Rivers. Vicinity map. 7 <br /> Figure 2. Two Rivers. Site map. 7 <br /> Figure 3. Two Rivers. FEMA 100-yr floodplain. 9 <br /> Figure 4. Central Pit. Pit fill time and water surface elevation vs. head cut elevation 17 <br /> for <br /> 100 ft riverside berm. <br /> Figure 5. Central Pit. Pit fill time and water surface elevation vs. head cut elevation 18 <br /> for <br /> 150 ft riverside berm. <br /> Figure 6. Central Pit. Pit fill time and water surface elevation vs. head cut elevation 19 <br /> for <br /> 200 ft riverside berm. <br /> Figure 7. Pit fill time and water surface elevation vs. head cut elevation for a typical 20 <br /> riverside berm. <br /> Figure 8. Central Pit. South Platte River 100-yr water surface profile. 22 <br /> Figure 9. River stations for Figure 8. 22 <br /> pg.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.