Laserfiche WebLink
Page 16 <br /> 6.4.5 EXHIBIT I/J — Soils and Vegetation Information <br /> slopes of 3H:1V or flatter will be placed above finished slopes where necessary to direct any <br /> upland surface flows around the finished slopes to an established stable drainage corridor or <br /> grass-way. <br /> Resoiled areas will be allowed sufficient time to settle prior to seeding. Seeding will commonly <br /> follow in the fall or spring as detailed under Exhibit E — Reclamation Plan. Resoiling will occur <br /> when soil moisture is adequate to prevent blowing, yet dry enough to prevent compaction. Part of <br /> the soil rebuilding process on the reconstituted soils will be in establishing structure to the soils to <br /> facilitate plant-soil-water relationships. Overly compacted soils will tend to limit soil structure <br /> development and create a poor seedbed for later establishment, so revegetation may be deferred <br /> if soils to be reclaimed are manipulated while wet, instead of moist. <br /> Once applied to the surface, the new soils will be exposed to the raw forces of erosion until <br /> adequate vegetative cover and root mass develops. Erosion requires both detachment and <br /> transportation in order to occur. Running water, wind, and raindrop impact are the main forces of <br /> erosion acting upon the soil. The use of a sterile hybrid live cover crop will aid in the stabilization <br /> of the soil by allowing a quick vegetative cover to become established in advance of the native <br /> grasses. The hybrid will also serve as an aid to reduce competition resulting from the <br /> establishment and growth of unwanted pioneer species (weeds) on disturbed ground. <br /> The attending reclamation seed mixture, and as approved, has a provision for the use of a sterile <br /> hybrid grass in lieu of mulch. Mulch, even when crimped with specialized equipment, is subject to <br /> being blown off the property, or reduced to an ineffective stubble. Often, it has been observed to <br /> intercept rainfall where it quickly evaporates from the stubble surface, limiting the benefits of light <br /> precipitation by preventing infiltration and percolation of moisture to the root zone. The hybrid on <br /> the other hand will establish quickly, but since it is sterile, will not continue to compete with the <br /> emerging native grasses. After two to three years, the hybrid grass will begin to die out just as <br /> the native grasses emerge and improve their dominance over the revegetated areas. <br /> Increasing Organic matter, such as the incorporation of manure into fallow soils, will aid in the <br /> restructuring of the new soils by increasing the moisture and fertility holding capacity of the upper <br /> profile seed bed, while simultaneously facilitating healthier plant-soil-water relations and overall <br /> root development of the emerging grasses. As the roots of the emerging grasses develop and <br /> mature over time, the resulting root mass will serve to build upon the base percent organic matter <br /> content of the new soils, thereby increasing the potential for long term survival and spread of the <br /> established grasses. Soil testing may occur on the new soils to better gauge the need or success <br /> of any applied organic soil amendments respective of the resulting vegetative cover. <br /> The addition of fertilizer may also aid in the establishment, growth and survival of the emerging <br /> grasses. Fertilizer may be applied to the seeded areas at rates determined from soil tests of the <br /> reapplied soils. To this end, soils may be sampled as needed. Sampling will utilize a hand auger <br /> and approved NRCS soil sample bags, and utilizing recommended procedures. Any soil testing will <br /> be conducted by the CSU Soil Laboratory in Ft. Collins, Colorado. The tests will be used to <br /> monitor soil quality and suitability of any amendments. Fertilizer may be withheld until after <br /> emergence to deter the encouragement of weed species. The use, composition and rates of <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MIING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />