Laserfiche WebLink
Page 120 <br /> 6.4.5 EXHIBIT D - Extraction Plan <br /> Backup sirens and heavy equipment averaged 60.0± to 75± decibels, with <br /> similar decreases in decibel readings from the source measured in a manner <br /> similar to that indicated for the crusher and plant equipment sources. Plant <br /> stockpiles will aid muting of plant sourced noise just as noise levels at areas <br /> of extraction are buffered with increasing depth of extraction. <br /> The location of the portable scale and scale house and correlated internal <br /> traffic at the plant site location will vary depending upon production levels <br /> and areas needed for product stockpiling. Regardless, the scale house will be <br /> located along internal paths for haul trucks, where finished material will be <br /> weighed and disembarked to help build the urban matrix of roads, highways, <br /> foundations, and desirable neighborhoods communities most desire. <br /> For a diverse list of products to be extracted and/or processed, and sold, they <br /> may include but are not limited to the more common products identified <br /> under Table DI - Earth Products, or other inert or commonly useful products <br /> used for diverse construction purposes, including, but not limited to: structural <br /> fill, concrete products, road construction products; and other products to aid <br /> the residential, commercial, industrial customer; and for any other <br /> infrastructure use. Explosives - will not be utilized. <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MIING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />