My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-28_REVISION - M1981276
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981276
>
2022-03-28_REVISION - M1981276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 10:23:59 AM
Creation date
3/29/2022 8:58:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981276
IBM Index Class Name
Revision
Doc Date
3/28/2022
Doc Name
Request For Amendment To Permit
From
Bower Bros Constructions
To
DRMS
Type & Sequence
AM1
Email Name
ZTT
JDM
SMS
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bower Brothers Construction <br /> "Hertzog Pit" <br /> Ea�hibit"E" <br /> Reclamation Plan(Lay Creek Pit) <br /> A) Reclamation will be done immediately following the removal of limestone <br /> deposits. Pit edges will be graded to 3:1 slopes and will be shaped to promote <br /> wildlife habitat. Reclaimed land will be covered with 6-10 inches of topsoil and <br /> reseeded. Pit edges will be replaced with a loader and shaped with an excavator or <br /> dozer. <br /> B) Post mining uses will be wildlife habitat and livestock grazing. Other land uses in <br /> the area are livestock grazing. <br /> C) Reclamation plan will be implemented at the extraction of limestone deposits. <br /> Phase I to be mined over the summer of 2021 - 2051. Reclamation of Phase 1 to <br /> take place immediately following removal of limestone deposits. After placing <br /> and shaping of reclaimed land, 6-10 inches of topsoil will be spread across <br /> reclaimed surfaces and will be seeded as follows per soil conservation office. <br /> D) N/A <br /> E) i Affected land to be reclaimed by the summer 2051. <br /> ii Phase I - 15 acres <br /> iii 1 overburden placement and slope rebuilding. <br /> 2 berm and edge pit shaping <br /> 3 topsoil placement <br /> 4 reseeding <br /> F) i Slopes to be graded to 3:1 <br /> ii 1 Sainfoin—2.S lbs/acre <br /> 2 Bromine Smooth— 1.61bs/acre <br /> 3 Intermediate Wheatgrass—2.5 ibs/acre <br /> 4 Pubescent Wheatgrass—2.25 lbs/acre <br /> 5 Orchard—0.3 lbs/acre <br /> iii N/A <br /> iv N/A <br /> v 6-10 inches of topsoil to be replaced on affected areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.