Laserfiche WebLink
Inouye Pit SWSP Page 6 of 7 <br /> March 24, 2022 <br /> In addition, the Applicant shall verify that the entity making replacements has included the <br /> Applicant on their accounting and submitted their accounting to the Division Office and the Water <br /> Commissioner, and shall claim credit only for actual amounts released as shown in the entity's <br /> accounting. For this SWSP, that entity is the Central Colorado Water Conservancy District. <br /> 11. Conveyance loss for delivery of augmentation water to the point of depletion on the South Platte <br /> River is subject to assessment and modification as determined by the Division Engineer. <br /> 12. In order to prevent injury to other water rights, the division engineer and water commissioner must <br /> be able to administer Applicants' replacement water past headgates on the river at times when <br /> those headgates would otherwise be legally entitled to divert all available flow in or "sweep" the <br /> South Platte River or its tributaries. Applicant shall not receive credit for replacement of depletions <br /> to the South Platte River below such diversion structures unless bypass and measurement structures <br /> are in place to allow the division engineer and water commissioner to confirm that Applicant's <br /> replacement water is delivered past the headgates. In the event that delivery past dry-up points <br /> requires the use of a structure for which a carriage or use agreement with a third party is required, <br /> Applicant shall be responsible for securing such agreement. Until such time as the Applicant <br /> provides a copy of the carriage or use agreement to the division engineer and water commissioner, <br /> no credit will be allowed for replacement of depletions to the South Platte River below such <br /> diversion structure. <br /> 13. The Division of Water Resources will not be responsible for any enforcement or administration of <br /> third party agreements that are not included in a decree of the water court. <br /> 14. Applicant shall follow the Augmentation Plan Accounting or any other applicable protocols as <br /> referenced in the attached documents, for the operation of this SWSP. <br /> 15. The name, mailing address, and phone number of the contact person who will be responsible for <br /> operation and accounting of this plan must be provided on the accounting forms to the Division <br /> Engineer and Water Commissioner. <br /> 16. All releases of replacement water must be sufficient to cover all out-of-priority depletions in time, <br /> place, and amount and must be made under the direction and/or the approval of the Water <br /> Commissioner. Notice must be provided and approval made by the Water Commissioner at least 48 <br /> hours prior to the release of replacement water, or as required by the Water Commissioner. <br /> 17. The approval of this SWSP does not relieve the Applicant and/or landowner of the requirement to <br /> obtain a Water Court decree approving a permanent plan for augmentation or mitigation to ensure <br /> the permanent replacement of all depletions, including long-term evaporation losses and lagged <br /> depletions after gravel mining operations have ceased. If reclamation of the mine site will produce <br /> a permanent water surface exposing groundwater to evaporation, an application for a plan for <br /> augmentation must be filed with the Division 1 Water Court at least three (3) years prior to the <br /> completion of mining to include, but not be limited to, long-term evaporation losses and lagged <br /> depletions. If a lined pond results after reclamation, replacement of lagged depletions shall <br /> continue until there is no longer an effect on stream flow. <br /> 18. The State Engineer may revoke this SWSP or add additional restrictions to its operation if at any <br /> time the State Engineer determines that injury to other vested water rights has occurred or will <br /> occur as a result of the operation of this SWSP. Should this SWSP expire without renewal or be <br /> revoked prior to adjudication of a permanent plan for augmentation, all excavation of the product <br /> from below the water table, and all other use of water at the pit, must cease immediately. <br />