My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-28_HYDROLOGY - M2008080
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008080
>
2022-03-28_HYDROLOGY - M2008080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2022 2:46:36 PM
Creation date
3/28/2022 11:37:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
Hydrology
Doc Date
3/28/2022
Doc Name
Substitute Water Supply Plan
From
Joanna Williams
To
Paul Weiss PE -William & Weiss Consulting, LLC
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Journey Ventures Pit SWSP Page 2 of 5 <br /> March 24, 2022 <br /> Depletions <br /> A total of 1.653 acres of water surface area is exposed at the site within the boundaries of the slurry wall. <br /> Gross annual evaporation at the gravel pit location is estimated to be 46.0 inches per year, and the monthly <br /> distribution is as shown on attached Table 1. Net evaporation is defined as gross evaporation less the <br /> consumptive use of water by vegetation that naturally occurred at the site prior to construction of the pit. <br /> The historical consumptive use by vegetation was assumed to be equal to the effective precipitation, which <br /> was estimated based on the data from the Kersey weather station. The net evaporation for the exposed <br /> water surface is 38.4 inches per year, with a monthly distribution as shown on attached Table 1. Using the <br /> estimated exposed water surface area of 1.653 acres, the total annual stream depletion resulting from the <br /> exposure of water is estimated to be 5.29 acre-feet. <br /> You have provided a monthly breakdown of the depletions during this plan period, which include 5.29 acre- <br /> feet of net evaporative loss and 6.25 acre-feet of water consumed for dust control, for a total depletion of <br /> 11.54 acre-feet, as shown on attached Table 3. Water used for dust control will be pumped from within <br /> the boundaries of the slurry wall. The Applicant must measure all water diverted for dust control and <br /> replace all depletions resulting from such diversions. <br /> The IDS AWAS stream depletion model, using the alluvial aquifer option, was used to determine the lagged <br /> depletions to the South Platte River from past mining operations. The following parameters were used in <br /> the model: transmissivity (T) = 100,000 gallons per day per foot, distance (X) from the centroid of the <br /> surface of the exposed ground water to the river = 4,766 feet, distance (W) from the aquifer boundary <br /> through the exposed ground water to the river channel = 9,500 feet, and specific yield (SY) = 0.2. The <br /> lagged depletions during this plan period due to past mining operations total 18.37 acre-feet, as shown in <br /> attached Table 3. <br /> Since all depletions during this plan period will occur within the boundaries of the slurry wall the Applicant <br /> has assumed that such depletions are instantaneous. Therefore the total depletions during this plan period <br /> are estimated to total 29.91 acre-feet, as shown in attached Table 3 <br /> Dewatering <br /> Dewatering began in October 2015. Dewatering water was historically discharge to the silt pond and the <br /> recharge pond and was assumed to return to the stream in the same timing as the dewatering depletions. <br /> During this plan period dewatering may only occur within the boundaries of the slurry wall and such water <br /> must be discharged to the slough that runs back to the river, unless prior approval for a different discharge <br /> location is first approved by the water commissioner. <br /> Replacements <br /> The operator proposes to provide replacement for this pit using fully consumable water leased from the <br /> Central Colorado Water Conservancy District ("CCWCD"). A copy of the lease agreement with CCWCD for <br /> up to 32.08 acre-feet for one year from April 2022 through March 2023 was provided to this office with the <br /> SWSP request and is attached to this letter. The leased water includes additional water to cover transit <br /> losses, based on a transit loss of 0.5 percent per mile. <br /> Water will be released from the Geisert Pit, located along the Poudre River in Greeley and approximately <br /> 6.8 miles upstream from the Journey Ventures Pit. The Ogilvy Ditch headgate on the Cache la Poudre River <br /> is a potential summer dry-up point that is located between Geisert Pit and the location of the Journey <br /> Venture Pit depletion point, in the SE '/a of Section 7, Township 5 North, Range 64 West of the 6th P.M. <br /> Central has a bypass structure at the Ogilvy Ditch headgate to pass augmentation flows by the Ogilvy at <br /> times when the Ogilvy is diverting the entire flow of the Cache la Poudre River. Alternatively CCWCD will <br /> release water for the Nissen Pit, located along the lower South Platte just upstream of the confluence with <br />
The URL can be used to link to this page
Your browser does not support the video tag.