My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-25_HYDROLOGY - M2017036
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2017036
>
2022-03-25_HYDROLOGY - M2017036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2022 2:39:49 PM
Creation date
3/28/2022 9:09:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
Hydrology
Doc Date
3/25/2022
Doc Name
Substitute Water Supply Plan
From
Loveland Ready-Mix Concrete
To
DRMS
Email Name
BFB
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Knox Pit SWSP January 19, 2022 <br /> Plan ID 5958 Page 4 of 8 <br /> for this plan period. Consumptive use due to evaporation (including truck washing and dust control) <br /> and production purposes at the site will therefore total 42.65 acre-feet durin� this ptan period. <br /> Lagged Recharge/Depletions <br /> The Phase 1 £t 2 Sump, as shown on the attached Figure 3, is tocated closer to the river than <br /> the Water Management Pond where dewatering water will be placed for recharge. Therefore, it <br /> cannot be assumed that the depletions from dewatering are offset by deliveries to the Water <br /> Management Pond. The depletions from pumping of the Phase 1 �t 2 Sump for dewatering purposes <br /> and the accretions for recharge from the Water Management Pond were calculated using the Alluvial <br /> Water Accounting System (AWAS) program developed by the Integrated Decision Support (IDS) Group <br /> at Colorado State University with the alluvial aquifer boundary condition. <br /> The monthly groundwater depletions were lagged from the Phase 1 �t 2 Sump to the Cache la <br /> Poudre River in the SW'/a of the NW '/a of Section 32, Township 8 North, Range 69 West, 6`h P.M. using <br /> the following parameters: <br /> • Distance from the Phase 1 £� 2 Sump to the river (X) = 3,270 feet <br /> • Distance from the river to the no-flow boundary (W) = 6,000 feet <br /> • Specific yield (S) = 0.20 <br /> • Transmissivity (T) = 50,000 gallons per day per foot <br /> The AWAS model was utilized to develop a unit response function (URF) to estimate monthly <br /> tagged depletions to the river. <br /> The monthly groundwater accretions from the Water Management Pond were catculated as <br /> the amount of water pumped for dewatering purposes, minus the operational and evaporative <br /> consumptive use of water at the site as described above. The volume of the "first fill" associated <br /> with the dewatering and completion of excavation of the Water Management Pond was accounted for <br /> by subtracting 53.37 acre-feet from the volume of groundwater considered to be recharged to the <br /> aquifer for the month of July 2022. <br /> The resulting accretions were lag�ed from the Water Management Pond to the same point on <br /> the Cache la Poudre River in the SW'/a of the NW�/a of Section 32, Township 8 North, Range 69 West, <br /> 6`h P.M. using the following parameters: <br /> • Distance from the Water Management Pond to the river (X) = 4,250 feet <br /> • Distance from the river to the no-ftow boundary (W) = 6,000 feet <br /> • Specific yield (S) = 0.20 <br /> • Transmissivity (T) = 50,000 gallons per day per foot <br /> The AWAS modet was utilized to develop a unit response function (URF) to estimate monthly <br /> lagged recharge accretions to the river. After accounting for recharge accretions, you have <br /> calculated lagged depletions resulting from operations at the site to total 69.35 acre-feet for this <br /> plan period as shown on the attached Figure 7. Using the previousty provided URFs, past accounting <br /> submittals, and projected depletions/rechar�e for this plan period, the SEO has calculated lagged <br /> deptetions to total 76.60 acre-feet for this plan period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.