Laserfiche WebLink
o����to <br /> ��� ��$ <br /> ,, . COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> hn�� <br /> *�* 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> �876 <br /> TR-2 <br /> REOUEST FOR TECHNICAL REVISION(TR)COVER SHEET <br /> ACY/THM <br /> File No.: M- 2O�4-063 Site Name:WRC W2t Plt <br /> coun� Rio Blanco TR# �s���.� <br /> Pe�,;ttee:White River City Investments, LLC <br /> � .. <br /> Operator(If Other than Permittee): AT�oN, <br /> Permittee Representative: <br /> Betty Kracht, White River Consultir4�""� �s,�;�TY-MIN€RA4�S <br /> Please provide a brief description of the proposed revision: <br /> Proposing to reduce the bond amount to$500.00 (the lowest amount available). Mining has not commenced <br /> on the pit and there is no date for mining in the near future. However, 90 days nrior to anv mining activi y the <br /> Permitee will notify the state so the bond can be recalculated prior to any mining activity. <br /> As de�ned by the Minerals Rules, a Technical Revision(TR)is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,th�Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tvpe Repuired TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction � <br /> materials, and 112 quarries $216 � <br /> 112 hard rock(not DMO) $175 � <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />