Laserfiche WebLink
To: Mr. Peter Hays <br />Date: March 21, 2022 <br />Page 5 <br /> <br /> 20220314_DRMS_Adequacy_Review_Response_MASTER.docx <br /> <br />The Division recalculated the cost for an independent contractor to reclaim the site based <br />on the information submitted by the Applicant at $398,000.00. A copy of the Division’s <br />bond estimate is attached for review. The Division will accept the total place-holder bond <br />in the amount of $398,000.00 and require the Operator to submit a revised financial <br />warranty estimate prior to commencing mining activities at the site. <br />Minor comments or questions responses: <br /> The Division used the MEANS average superintendent cost at 50% of the total <br />task hours, which is standard procedure for the Division. <br /> The weed control costs under Mulching and Miscellaneous Application were <br />removed by the Division in the revised bond estimate. Please see attached. <br /> Task 002 - Topsoil C1 Shoreline utilizes a team of one (1) loader and two (2) <br />haul trucks, therefore the Mob/Demob sheet accounts for 2 roadable trucks. <br />The third roadable truck listed on the Mob/Demob sheet is a light duty pickup <br />for the superintendent. <br />Response 26 <br />Thank you for the revisions to the bond estimate and explanations. <br />6.4.18 EXHIBIT R - PROOF OF FILING WITH COUNTY CLERK <br />AND RECORDER <br />Comment 28 <br />Please provide an affidavit or receipt indicating the date on which the revised application <br />information required to address this adequacy letter was placed with the Weld County <br />Clerk and Recorder for public review, pursuant to Subparagraph 1.6.2(1)(c). <br />Response 28 <br />Please see Attachment 5. <br />MEMOS <br />Comment 32 <br />The adequacy response for the Inlet Protection report are currently under review by the <br />Division. A copy of the second review memo will be sent under separate cover, if needed.