Laserfiche WebLink
EXHIBIT F <br /> Rule 6.3.6 <br /> List of Other Permits and Licenses Required <br /> The Applicant is not required to obtain any county permits for the Extraction Site. As the <br /> Applicant intends to mine less than 70,000 tons per year of product material, an air quality <br /> permit will not be required. The Applicant will file a Mining Operations APEN prior to starting <br /> construction. All stormwater will drain into the extraction pit and will be absorbed into the <br /> ground within 72 hours. As there will be no discharge of stormwater into surface waters, no <br /> stormwater permit is required. No other state permits are required. <br /> Burton Farms LLLP Page 1 of 1 <br /> Construction Materials Limited Impact(I 10(c))Operation Reclamation Permit Application Form <br />