My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-21_PERMIT FILE - M2022012
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022012
>
2022-03-21_PERMIT FILE - M2022012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 5:52:19 AM
Creation date
3/23/2022 8:45:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022012
IBM Index Class Name
Permit File
Doc Date
3/21/2022
Doc Name
Application
From
Burton Farms LLLP
To
DRMS
Email Name
CCW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hydrologic Balance—The proposed operation's impacts on the hydrologic balance will be <br /> minimal. Groundwater will not be encountered and surface water will be managed as outlined in <br /> the previous section and in the stormwater management plan. <br /> Off-site Damage—The boundaries of the site will be clearly marked to prevent off-site damage <br /> during the excavation activities. <br /> Stable Configuration—Mining is occurring in very competent rock. During mining, side slopes to <br /> the pit will be managed for stability and safety of the equipment operators. Upon final <br /> reclamation, slopes will be revegetated to the extent possible to provide for a stable post-mining <br /> configuration. <br /> (m) On-Site Processing: <br /> A portable crusher/screening unit will be used to process the raw mined material into several <br /> salable products including boulders,rip-rap of varying sizes, and 1 inch, 3/4 inch/ %2 inch and <br /> smaller fraction rock products. <br /> (n) Commodities to be Extracted and their Use: <br /> Riprap along with structural fill/construction aggregates (crushed rock) are the primary <br /> commodities to be mined. There are no other commodities to be mined. Products from this mine <br /> site will be used for construction materials. <br /> (o) Incidental Products: <br /> Crushed and screened rock are the only products expected to be produced at this site. <br /> (p) Explosives: <br /> Explosives will be used during mining or reclamation. This site has been mined in this fashion <br /> from the beginning with no adverse effects and blasting has been found to be suitable and <br /> necessary to extract this rock outcrop. At this time the applicant requests that DRMS place a <br /> condition on this permit to require that a Technical Revision incorporating a blasting plan be <br /> submitted and approved before any future blasting may occur. Presently there is enough blasted <br /> and stockpiled material to carry on production without blasting for some time. This will allow <br /> the operator to assess the site and prepare a more detailed plan for Division review and approval. <br /> Attachments: <br /> Exhibit C-1: Mining Plan Map <br /> Exhibit C-2: Stormwater Management Plan <br /> Burton Farms LLLP Page 5 of 5 <br /> Construction Materials Limited Impact 010(c))Operation Reclamation Permit Application Form <br />
The URL can be used to link to this page
Your browser does not support the video tag.