Laserfiche WebLink
March 17, 2022 C-1981-035/King Coal Mine LJW <br /> E <br /> 'l i <br /> =1. <br /> '. <br /> AM <br /> Chotoine: View northeast,showing the compacted surface as well as stockpiled material <br /> Lower Refuse Pile. The stockpiled material will be used to adjust the grade of the pile. <br /> .r <br /> Photo Ten: View east,showing more of the stockpiled material and compacted surface of <br /> the Lower Refuse Pile. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 8 of 8 <br />