My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-18_INSPECTION - M2018029
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2018029
>
2022-03-18_INSPECTION - M2018029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 11:34:21 AM
Creation date
3/22/2022 7:56:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018029
IBM Index Class Name
Inspection
Doc Date
3/18/2022
Doc Name
Inspection Report
From
DRMS
To
Bernard (Joe) Montoya White Wolf Construction & Landscaping, LLC
Inspection Date
2/23/2022
Email Name
CJD
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT#: M-2018-029 <br /> INSPECTOR'S INITIALS: CID <br /> INSPECTION DATE:February 23,2022 <br /> Reclamation Plan/Compliance: <br /> Reclamation has not begun but it is expected that the operation will be complete and the excavation will be <br /> graded in accordance with the reclamation plan by the end of the year. (4-6 inches of topsoil, 3H:1V slopes, <br /> Zone 2 Foothills Lower Montane seed mix for seeding.) <br /> Financial Warranty: <br /> The current required financial warranty for the site is $2,500.00, the Division currently holds a financial <br /> warranty in the amount of$2,500.00 for this site in the form of the letter of credit. The Division has evaluated <br /> the reclamation liability for the site and calculated it to be $3,628.00. This amount is$1,128.00 more than the <br /> financial warranty currently held. The Division requests the operator review the enclosed reclamation cost <br /> estimate and provide the Division any questions or comments by April 1, 2022. The Division may issue a <br /> required surety increase notice after this date in accordance with Rule 4.2.1(2). If so, the operator will have <br /> sixty days from the date of this notice to provide the additionally required surety. <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.