Laserfiche WebLink
Cost Summary Worksheet Cont'd Task 4 022 Page 5 of 11 <br /> Weight description: Top Soil <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 1.200 (CAT HB) <br /> Dozing method: 1.100 (50%SL) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (SSD-AC) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 1.438 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 1.0540 <br /> Adjusted unit 575.48 LCY/hr <br /> production: <br /> Adjusted fleet 575.48 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.575/LCY <br /> Total job time: 12.62 Hours <br /> Total job cost: $4,174 <br /> CIRCES Cost Estimating Software <br />