My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-18_REVISION - M2000115
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000115
>
2022-03-18_REVISION - M2000115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2022 11:34:08 AM
Creation date
3/22/2022 7:54:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000115
IBM Index Class Name
Revision
Doc Date
3/18/2022
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Myron Mullett - Mullett Excavating, LLC
Email Name
JLE
CJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: Mulletts Excavating Pit#1 Permit Action: 2022 Bond Calculation Permit/Job#: M2000115 <br /> PROJECT IDENTIFICATION <br /> Task#: 022 State: Colorado Abbreviation: None <br /> Date: 3/10/2022 County: Las Animas Filename: M115-022 <br /> User: CJD <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Grade slopes to 31-1:1V DOZER 1 17.66 $5,951 <br /> 002 Replace 6 inches of topsoil for 9 acres DOZER 1 12.62 $4,174 <br /> 003 Revegetation REVEGE 1 5.00 $7,848 <br /> 004 Spreading overburden over 9 acres DOZER 1 62.83 $20,984 <br /> 005 Mobilization MOBILIZE 1 5.15 $4,596 <br /> SUBTOTALS: 103.26 $43,553 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $880 <br /> Performance bond: 1.05 Total= $457 <br /> Job superintendent: 51.63 Total= $3,719 <br /> Profit: 10.00 Total= $4,355 <br /> TOTAL O&P= $9,411 <br /> CONTRACT AMOUNT(direct+O&P)_ $52,964 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $2,251 <br /> Reclamation management and/or administration: 5.00 $2,648 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $14,810 <br /> TOTAL BOND AMOUNT(direct+indirect)_ $58,363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.