Laserfiche WebLink
PERMIT#: M-2000-115 <br /> INSPECTOR'S INITIALS: CID <br /> INSPECTION DATE:February 23,2022 <br /> CORRECTIVE ACTION DUE DATE: 5/01/22 <br /> INSPECTION TOPIC: Gen. Compliance With Mine Plan <br /> PROBLEM: During the inspection we measured the height of the highwall on the north side of the pit and found it <br /> to be about 35 feet.The current mine plan states that the pit will not exceed a 25 foot depth. The mine plan <br /> needs to be updated and clarified pursuant to C.R.S. 34-32.5-112 (1)(c)(VI). <br /> CORRECTIVE ACTIONS: The operator shall submit a Technical Revision, with the required $216 revision fee, to <br /> update and clarify the current approved mine plan to reflect existing and proposed activities by the corrective <br /> action date. <br /> CORRECTIVE ACTION DUE DATE: 5/01/22 <br /> Page 2 of 10 <br />