Laserfiche WebLink
RECEPTION#20190002599, 1/16/2019 11:59:21)AM,10 of 13, <br /> Angela Myers,Clerk&Recorder,Larimer County,CO <br /> Findings and Resolution <br /> Laporte Pit Special Review <br /> Page 10 <br /> 21. The access road shall be paved prior to any material hauled off site. <br /> 22. The internal dirt access road proposed around the processing plant for incoming <br /> Loveland Ready Mix trucks shall be watered to reduce dust. <br /> 23. Speed limit signs shall be posted along the access road and other internal haul roads <br /> for noise and dust mitigation. Traffic signs for one-way traffic around the processing plant shall also <br /> be installed to mitigate noise from customer vehicles. <br /> 24. Emergency maintenance shall be allowed at any time. Normal maintenance may not <br /> occur in the quarry area unless during normal world-ig hours. <br /> 25. The Larimer County Environmental Health Department has the right to enforce the <br /> county noise ordinance. <br /> 26, The controls required by the Air Pollution Control Division's air construction permit <br /> and will require additional controls and dust/emissions are found to be in violation. <br /> 27. No parking, loading or unloading of any vehicles will be allowed within the County <br /> right-of-way. <br /> 28. Trucks shall not back onto or use the County Road for a turnaround. <br /> 29. The applicant is responsible for prompt, complete removal of material spilled onto <br /> the County roadway. <br /> 30. The design and construction of the County Road 54G improvement must be <br /> completed prior to the use commencing or within a limited amount of time after the date of this <br /> Findings and Resolution. <br /> 31. Truck traffic will be restricted from traveling west on County Road 54G except for <br /> local deliveries and Overland Trail from Highway 287. <br /> 32. The Engineering Department reserves the right to further comment on traffic and <br /> access issues if the projected traffic impact, access location,or haul route changes. <br /> 33. A drainage agreement for the maintenance of the retention ponds post-reclamation <br /> must be submitted. The agreement must include maintenance responsibilities of the perimeter drain <br /> if it were to fail in the future. <br /> 34. Secondary access to the site will be a gated emergency only access. <br />