Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#004 Page 82 of 82 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: MONTROSE <br /> Total one-way travel distance: 70.00 miles <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $3,533.29 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $152.91 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 1.56 1.56 <br /> Return Time(Hours): 1.56 1.56 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 4.11 3.11 <br /> JOB TIME AND COST <br /> Total job time: 8.22 Hours <br /> Total job cost: $3,686 <br />