My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-14_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2022-03-14_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 8:21:01 AM
Creation date
3/16/2022 8:10:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
3/14/2022
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
RN2
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: GRAND JUNCTION <br /> Total one-way travel distance: 110.00 miles <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $27,526.40 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $693.49 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 2.44 2.44 <br /> Return Time(Hours): 2.44 2.44 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 5.89 4.89 <br /> JOB TIME AND COST <br /> Total job time: 11.78 Hours <br /> Total job cost: $28,220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.