Laserfiche WebLink
Haul Route: <br /> Seg# Haul Distance(Ft) Grade(%) Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (fpm) (min) <br /> 1 5000.00 0.00 3.00 3.00 2824 1.874 <br /> Haul Time: 1.874 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade(%) Roll.Res Total Res Velocity Travel Time <br /> (%) (%) (fpm) (min) <br /> 1 5000.00 0.00 3.00 3.00 2874 1.768 <br /> Return Time: 1.768 minutes <br /> Total Truck Cycle Time: 7.382 minutes <br /> Loading Tool unit <br /> Production 189.43 LCY/Hour Adjusted for job efficiency: 157.23 LCY/Hour <br /> Truck Unit Production <br /> 75.44 LCY/Hour Adjusted for job efficiency: 62.62 LCY/Hour <br /> Optimal No.of Trucks: 3 Truck(s) Selected Number of Trucks: 3 Truck(s) <br /> Adjusted hourly truck team production: 187.85 LCY/Hour <br /> Adjusted single truck/loader team production: 157.23 LCY/Hour <br /> Adjusted multiple truck/loader team production: 157.23 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 95.40 Hours <br /> Unit cost: $2.272 /LCY Total job cost: $34,074 <br />