My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-14_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2022-03-14_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 8:21:01 AM
Creation date
3/16/2022 8:10:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
3/14/2022
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
RN2
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br /> Task description: Clean Sediment Ponds <br /> Site: New Horizon North Mine Permit Action: RN2 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 105 State: Colorado Abbreviation: None <br /> Date: 3/10/2022 County: Montrose Filename: C089-105 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 8-10 cy,6x4 <br /> -Loader: Cat 336D L 10'-6" Stick <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 NA NA NA NA <br /> Ownership cost/hour: $18.14 $83.42 NA NA NA NA <br /> Operating cost/hour: $35.95 $74.14 NA NA NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. NA $0.00 NA NA NA NA <br /> cost/hour: <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $0.00 $37.32 NA NA NA NA <br /> Unit Subtotals: $54.09 $194.88 NA NA NA NA <br /> Number of Units: 3 1 0 0 0 0 <br /> Group Subtotals: Work: $357.15 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $357.15 <br /> MATERIAL QUANTITIES <br /> Initial volume: 15,000 CCY Swell factor: 1.000 <br /> Loose volume: 15,000 LCY <br /> Source of estimated volume: Division Estimate <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(,weight)Basis: <br /> Material weight: 2,700 Pounds/LCY <br /> Description: Earth-Wet excavated <br /> Rated Payload: 27,280 Pounds <br />
The URL can be used to link to this page
Your browser does not support the video tag.