My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-14_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2022-03-14_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 8:21:01 AM
Creation date
3/16/2022 8:10:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
3/14/2022
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
RN2
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: RN2-Remaining tasks <br /> Site: New Horizon North Mine Permit Action: RN2 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 3/10/2022 County: Montrose Filename: C089-000 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 004 Regrade Facilities Area DOZER 2 9.75 $11,481 <br /> O10 Rip Facilities Area RIPPER 2 5.76 $7,442 <br /> Oil Rip West Haul Road RIPPER 1 0.34 $224 <br /> 015 Rip All Topsoil Replacement Areas Prior to RIPPER 2 136.96 $176,753 <br /> Reseeding <br /> 020 Regrade East Coal Gate Rd DOZER 2 0.70 $818 <br /> 022 Regrade South Access Road DOZER 1 1.67 $982 <br /> 031 Finish Grade Facilities Area GRADER 1 5.02 $878 <br /> 040 Regrade Pond NIIN-001 DOZER 1 29.79 $9,857 <br /> 041 Regrade Pond NIIN-002 DOZER 1 40.05 $13,252 <br /> 043 Regrade Ditch NHN-001 East DOZER 1 5.48 $1,813 <br /> 044 Regrade Ditch NHN-001 West DOZER 1 1.37 $453 <br /> 046 Regrade Ditch NHN-002 DOZER 1 2.74 $907 <br /> 055 Replace Topsoil from Stockpile to 2013 Pit Area TRUCKI 1 15.62 $32,606 <br /> 056 Replace Topsoil from Stockpile to 2014 Pit Area TRUCKI 1 17.34 $42,240 <br /> 057 Replace Topsoil from Stockpile to 2015 Pit Area TRUCKI 1 17.34 $42,240 <br /> 058 Replace Topsoil from Stockpile to 2016 Pit Area TRUCKI 1 24.86 $60,561 <br /> 059 Replace Topsoil from Stockpile to Facilities Area TRUCKI 1 4.75 $9,914 <br /> 060 Replace Topsoil from Stockpile to Topsoil DOZER 2 2.05 $2,411 <br /> Stockpile Area <br /> 061 Replace Topsoil from Stockpile Overburden TRUCKI 1 8.78 $18,330 <br /> Stockpile Are <br /> 062 Replace Topsoil from Stockpile to West Haul Road TRUCKI 1 6.34 $15,434 <br /> 064 Replace Topsoil from Stockpile to South Acces TRUCKI 1 1.76 $4,277 <br /> Road <br /> 066 Replace Topsoil from Stockpile to Pond NHN-001 TRUCKI 1 5.31 $11,090 <br /> and Ditches <br /> 067 Replace Topsoil from Stockpile to Pond NIIN-002 TRUCKI 1 2.94 $7,152 <br /> and Ditches <br /> 075 Reseed Pit Areas with Dryland Mix#8 REVEGE 1 75.26 $12,510 <br /> (seeded2017.-2020) <br /> 076 Reseed Pit Areas with Irrigated Pasture Mix#5 REVEGE 1 36.40 $33,161 <br /> 077 Seed areas in long term facilities with Dryland REVEGE 1 18.80 $16,909 <br /> seed mix 8 <br /> 088 Drill Seed Cover Crop on IP REVEGE 1 55.20 $21,651 <br /> 095 Demolish and Remove All Structures DEMOLISH 1 480.00 $69,191 <br /> 100 Plug and Seal All Monitoring Wells BOREHOLE 1 36.00 $3,750 <br /> 105 Clean Sediment Ponds TRUCKI 1 95.40 $34,074 <br /> 106 Site Maintenance Over Liability Period(6 more SITENWNT 1 120.00 $41,840 <br /> years) ENANCE <br /> 110 Mobilize/Demobilize Equipment for Initial MOBILIZE 1 11.77 $28,220 <br /> Reclamation <br />
The URL can be used to link to this page
Your browser does not support the video tag.