My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-14_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2022-03-14_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2022 8:21:01 AM
Creation date
3/16/2022 8:10:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
3/14/2022
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Type & Sequence
RN2
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br /> Task description: Replace Topsoil from Stockpile to 2013 Pit Area <br /> Site: New Horizon North Mine Permit Action: RN2 Permit/Job#: C2010089 <br /> PROJECT IDENTIFICATION <br /> Task#: 055 State: Colorado Abbreviation: None <br /> Date: 2/15/2022 County: Montrose Filename: 065-RN2 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Cat 777F <br /> -Loader: CAT 992K <br /> Support Equipment-Load Area: Cat DI IT- 11U <br /> -Dump Area: NA <br /> Road Maintenance-Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker, 10,000 Gal. <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Water Truck <br /> Grader <br /> %Utilization-machine: 100 100 100 NA 35 35 <br /> Ownership cost/hour: $175.01 $290.33 $274.04 NA $85.80 $84.03 <br /> Operating cost/hour: $139.87 $191.73 $273.21 NA $21.14 $38.03 <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own. NA $0.00 $0.00 NA $0.00 $0.00 <br /> cost/hour: <br /> Ripper op.cost/hour: NA $0.00 $0.00 NA $0.00 $0.00 <br /> Operator cost/hour: $33.71 $40.71 $41.30 NA $28.56 $21.12 <br /> Unit Subtotals: $348.59 $522.77 $588.55 NA $135.50 $143.18 <br /> Number of Units: 2 1 1 0 1 1 <br /> Group Subtotals: Work: $1,219.95 Support: $588.55 Maint: $278.68 <br /> Total work team cost/hour: $2,087.18 <br /> MATERIAL QUANTITIES <br /> Initial volume: 16,420 CCY Swell factor: 1.115 <br /> Loose volume: 18,308 LCY <br /> Source of estimated volume: Map 2.05.2-1,Division Volume Estimates <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payloadweight)Basis: <br /> Material weight: 2,100 Pounds/LCY <br /> Description: Earth-Loam <br /> Rated Payload: 200,000 Pounds <br />
The URL can be used to link to this page
Your browser does not support the video tag.