My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-15_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2022-03-15_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 7:16:02 AM
Creation date
3/15/2022 9:53:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
3/15/2022
Doc Name
Water Monitoring - Groundwater and Surface Water
From
Battle Mountain Resources, Inc
To
DRMS
Annual Report Year
2022
Report Quarter_Month
Feb
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2-Monthly Piezometer Elevations <br /> Monitoring Well Piezometer Depth Depth to Water Depth of Water <br /> Identification Observation Date ft ft ft <br /> P6 02/28/2022 72.46 DRY N/A <br /> P7 02/28/2022 92.50 92.27 0.23 <br /> P8 02/28/2022 97.51 96.58 0.93 <br /> P9 02/28/2022 72.30 71.92 0.38 <br /> P10 02/28/2022 58.30 57.46 0.84 <br /> I'll 02/28/2022 41.80 41.41 0.39 <br /> P12 02/28/2022 41.71 41.65 0.06 <br /> P13 02/28/2022 41.34 41.02 0.32 <br /> 1`14 1 02/28/2022 1 41.24 1 DRY I N/A <br /> P 15 1 02/28/2022 1 41.10 1 40.86 1 0.24 <br /> The leak detection system at the LTF Collection Pond was inspected February 28, 2022 and 890 gallons <br /> were evacuated from the leak detection system and pumped to the LTF. The LTF underdrain system was <br /> visually inspected February 28,2022 and the flow rate was measured to be approximately 31.5 gallons per <br /> minute(gpm). <br /> West Pit Waste Water Treatment Plant <br /> During the month of February 2022, the West Pit Waste Water Treatment Plant (WWTP) was operated <br /> intermittently (3 to 4 days per week) under Colorado Department of Public Health and Environment <br /> (CDPHE) CDPS Permit No. C00045675 for discharge into the Rito Seco alluvial aquifer. During the <br /> month, 5,892,400 gallons (18.1 acre-feet) of treated water was discharged to the Rito Seco and 345,100 <br /> gallons (1.06 acre-feet) of water was transferred from the West Pit to the Lined Tailing Facility (LTF). <br /> Additionally,no water was reinfiltrated into the West Pit in February. <br /> BMRI performed the monthly visual seepage expression inspections on February 28, 2022 in the historic <br /> seepage area identified in Figure 2 of the permit. No seepage expressions were observed in the historic <br /> seepage area. <br /> BMRI measured the monthly West Pit backfill, alluvial and monitoring wells as required under in the <br /> QA/QC Plan. Measurements obtained for the monthly wells are shown in Table 3. <br /> Table 3-Monthly and Quarterly Groundwater Depth to Water <br /> Monitoring Well Identification Observation Date Depth to Water <br /> ft <br /> BF-4 02/28/2022 24.88 <br /> BF-5R 02/28/2022 30.80 <br /> BF-6 02/28/2022 30.95 <br /> M-6 02/28/2022 DRY <br /> M-7 02/28/2022 DRY <br /> M-8 02/28/2022 DRY <br /> M-9 02/28/2022 141.59 <br /> M-10 02/28/2022 24.50 <br /> M-11 R 02/28/2022 39.19 <br /> M-12 02/28/2022 174.61 <br /> M-13R 02/28/2022 125.83 <br /> M-14 02/28/2022 130.66 <br /> M-16 02/28/2022 23.83 <br /> M-17 02/28/2022 30.32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.