My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-03-08_INSPECTION - M2012032
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2012032
>
2022-03-08_INSPECTION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:48:36 PM
Creation date
3/9/2022 9:50:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Inspection
Doc Date
3/8/2022
Doc Name
Inspection Problem Corrective Action
From
Ouray Silver Mines, Inc
To
DRMS
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ouray Silver Mines, Inc. <br /> 1900 Main St. Unit l <br /> PO Box 564 <br /> Ouray,CO 81427 <br /> '_mil L t ER lG`llNFS <br /> February 28t", 2022 <br /> Mr. Lucas West <br /> Colorado Division of Reclamation Mining and Safety <br /> 1313 Sherman Street, Rm 215 <br /> Denver, CO 80203 RECENFM <br /> Subject: Atlas TSF Tailings Placement and As-built Drawings MAR 0 8 2022 <br /> DRMS Permit No. M-2012-032 <br /> Revenue Mine, Ouray County, Colorado DIVISION OF RECLAMATION, <br /> MINING & SAFETY-MiNERALS <br /> Dear Mr. West, <br /> Ouray Silver Mines, Inc. (OSMI) is providing information requested by the Division of <br /> Reclamation Mining and Safety (DRMS) in its inspection report dated February 9, 2022 as well <br /> as discussed in a phone call between OSMI and DRMS on February 10, 2022. Specifically <br /> included in this submittal are: <br /> - As-built drawings of the Atlas Tailing Storage Facilities (TSFs). OSMI was able to <br /> generate as-builts drawings by surveying the area and digging through snow to access <br /> corners and edges of the pad at certain locations. The attached as-builts were confirmed <br /> against photos taken during construction as well as with the original design. We are <br /> calling this a Preliminary as-built drawing and will ground truth the survey once the snow <br /> melts. Below is an image of the pad during construction showing there is a berm around <br /> the TSF and runoff from the tailings placed in the pad will be directed towards the <br /> sediment pond. <br /> - The mine also committed to submit baseline characterization of the tailings using Acid <br /> Base Accounting (ABA), Toxicity Characterizations leachate Procedure (TCLP), and <br /> Phone: (970)325-9830 ♦ Fax: (970) 325-9824 <br />
The URL can be used to link to this page
Your browser does not support the video tag.