Laserfiche WebLink
I March 2022 C-1994-082/Yoast Mine RAR <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted <br /> V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection R - Roads <br /> N -Availability of Records N - Reclamation Success <br /> N - Backfill & Grading R - Revegetation <br /> NA - Excess Spoil and Dev. Waste N - Subsidence <br /> NA - Explosives N - Slides and Other Damage <br /> N - Fish & Wildlife NA - Support Facilities on site <br /> N - Hydrologic Balance N - Signs and Markers <br /> R - Gen. Compliance With Mine Plan NA - Support Facilities Not on site <br /> N - Other NA - Special Categories Of Mining <br /> NA - Processing Waste N - Topsoil <br /> COMMENTS <br /> This was a partial inspection of the Yoast Mine, C 1994082, operated by Seneca Property LLC. <br /> The inspection was conducted, and the report prepared by me, Robin Reilley of the DRMS. The <br /> weather was clear, and calm with temperatures hovering around 30 degrees F. The ground was <br /> snow covered. The roads were impassable, and the entire site was inaccessible as roads are not <br /> plowed in winter. <br /> PERMITTING ACTIONS: <br /> None <br /> MAINTENANCE ITEMS <br /> INSPECTION <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Reclamation has been completed at the site. No activity was occurring at the time of inspection. <br /> ROADS Rule 4.03 <br /> Construction 4.03.1(3), 4.03.2(3);Drainage 4.03.1(4), 4.03.2(4);Surfacing and Maintenance <br /> 4.03.1(5) and(6) 4.03.2(5) and(6). <br /> o Roads into the site were frozen and snow covered and the site was inaccessible at this <br /> time of year. <br /> RE VEGETATION-Rule 4.15 <br /> General Requirements 4.15.1; Use of Species 4.15.2, Grazing 4.15.5 <br /> o Reclamation and revegetation have been completed at this site,with most of the site phase <br /> II and Phase III bond released. <br /> o The drainage above Pond 12 comprising approximately 200 acres represents the only <br /> Phase I reclamation remaining at the site. <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 2 of 8 <br />