Laserfiche WebLink
TR-73 (12/2021) <br />I-40 Calculations for Two Ponds on the South Side of Railroad Loop Fill Slope (Ponds <br />RR-1 and RR-2) <br />I-41 Sediment Control Calculations - Material Storage at East Intakes <br />I-42 Refuse Data and Analysis (Mike Weigand's memo) <br />I-42A Refuse Data and Slope Stability Analysis Refuse Area 5A <br />I-42B Refuse Data and Slope Stability Analysis – Revised 2004 <br />I-43 Air Emission Permits <br />I-44 SEDCAD Runs on Various Areas, Small Area Exemption <br />I-45 SEDCAD Runs for Runoff Volume and V-Ditch Calculations, Road Base Storage <br />Pad <br />I-46 Water Discharge Permit <br />I-47 Reclamation Cost Estimate <br />I-48 IBLA Decision 94-366 <br />I-49 Post-reclamation Refuse Area Sedimentology Calculations <br />I-50 Refuse Pile Temporary Ditch Specifications <br />I-51 BLM Conditions <br />I-52 Completion of Typical Degas Borehole <br />I-53 B-Vent Shaft #2 Road Culvert Sizing Calculations <br />I-54 RDH-3 Road Culvert Sizing Calculations <br />I-55 B-Seam Dewatering System (SH-3) <br />I-56 SDH-3 Pond System Hydrology and Sedimentology <br />I-57 B-Seam Dewatering System #2 (SH-4) <br />I-58 Prep Plant Upgrade – Belt Press Addition <br />I-59 SEDCAD Runs for RP-A Pond <br />I-60 SEDCAD Runs for Red Wash Reservoir <br />I-61 1 Right Dewatering Pond Hydrology (DW-1R) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />