Laserfiche WebLink
TR - 73 (12/2021) <br />155 B-Vent Shaft #2, SH-1, SH-2, RDH-3 <br />156 B-Vent Shaft #3 <br />157 B-Seam Dewatering System <br />158 RDH #4 – Rock Dust Hole and Breathable Air <br />159 Nitrogen Plant #2 Facilities <br />160 B-Seam Dewatering Area #2 <br />161 Geotechnical Investigation Coring – Refuse Area Evaluation Site <br />162 Refuse Area A Site Plan <br />162A Sediment Pond RP-A Site Plan <br />163 Discharge Point of Compliance at Existing Red Wash Reservoir #2 <br />164 1 Right Dewatering Discharge (DW-1R) <br />164A 1 Right Dewatering Discharge Pond Details (DW-1R)