Laserfiche WebLink
TR - 73 (12/2021) <br />41 Scullion Gulch Channel Restoration P & P <br />42 Scullion Gulch Channel Restoration Sections <br />43 D Portal Area Site Restoration Plan Sheet 1 of 4 <br />44 D Portal Area Site Restoration Plan Sheet 2 of 4 <br />45 D Portal Area Site Restoration Plan Sheet 3 of 4 <br />46 D Portal Area Site Restoration Plan Sheet 4 of 4 <br />47 D Portal Area Site Restoration Sheet 1 of 2 <br />47A D Portal Area Site Restoration Sheet 2 of 2 <br />48 D Portal Area Base Map Sheet 1 of 4 <br />49 D Portal area Base Map Sheet 2 of 4 <br />50 D Portal Area Base Map Sheet 3 of 4 <br />51 D Portal Area Base Map Sheet 4 of 4 <br />52 Water Storage Area P & P and Sections <br />53 Water Storage Area Access Road P & P - 0 to 28.0 <br />54 Water Storage Area Access Road P & P - 28.0 to 41.5 <br />55 Water Storage Area Site Restoration Plan and Sections <br />56 Refuse Haul and Plant Access Roads P & P - 0 to 28.0 <br />57 Refuse Haul & Plant Access Roads P & P - 28.0 to 56.0 <br />58 Refuse Haul Road P & P - 56.0 to 84.0 <br />59 Refuse Haul Road P & P - 84.0 to 112.0 <br />60 Refuse Haul Road P & P - 112.0 to 140.0 <br />61 Refuse Haul Road P & P - 140.0 to 168 <br />62 Refuse Haul Road P & P - 168 to 196 <br />63 Refuse Haul Road P & P - 196 to 224 <br />64 Refuse Haul Road P & P - 224 to 252 <br />65 Refuse Haul Road P & P - 252 to 280 <br />66 Refuse Haul Road P & P - 280 to 289+69.23 <br />67 Refuse Haul Road Sections and Details Sheet 1 <br />68 Earthwork Misc. Sections Maximum Cuts and Fills <br />69 Earthwork Misc. Reclaimed Sections Maximum Cuts and Fills <br />70 Refuse Haul Road Topsoil Stripping and Storage - 0 to 56 <br />71 Refuse Haul Road Topsoil Stripping and Storage - 56 to 112 <br />72 Refuse Haul Road Topsoil Stripping and Storage - 112 to 168 <br />73 Refuse Haul Road Topsoil Stripping and Storage - 168 to 224 <br />74 Refuse Haul Road Topsoil Stripping and Storage - 224 to 252 <br />75 Refuse Haul Road Topsoil Stripping and Storage - 252 to 286+14.57 <br />76 Refuse Disposal Area Site Map <br />77 Refuse Area Sites 1, 2, 3, and 4 Preparation <br />77A Refuse Area Site 5A Site Plan <br />78 Refuse Area Sediment Pond RP-1 Plan, Sections and Details <br />79 Refuse Area Sediment Pond RP-2 and 3 Plan, Sections and Details <br />80 Refuse Area Sediment Pond RP-4 Plan, Sections and Details <br />80A Refuse Area Sediment Pond RP-5A Details <br />80B Typical Principal Spillway Plans, Sections & Details