My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-28_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2022-02-28_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 7:30:56 AM
Creation date
3/1/2022 1:46:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
2/28/2022
Doc Name Note
Application Cover Letter & Revised Pages
Doc Name
Proposed Revision Materials
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
SL21
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo Coal Company L.P. <br /> III. Summary of Reclamation and Management <br /> A. General Description <br /> As shown on Map 1, 13.3 acres are requested for Phase I bond release and is located in the West <br /> Pit. These areas were backfilled and graded in 2021. The bond release areas are comprised of <br /> two distinct parcels. <br /> The work completed for both bond release parcels included backfilling and final grading to the <br /> appropriate surface elevations. The bond release areas have been regraded consistent with the <br /> approved post-mining topography (See Map 19 in Permit No. C-1981-019 for the approved post- <br /> mining topography), and follows all criteria set forth for Phase I bond release by the Division. <br /> Please refer to Map 1 also for representative profiles of the backfilled and regraded areas in <br /> relation to the approved post-mining topography. <br /> SL-21 Phase I Bond Release Application Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.