My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-25_PERMIT FILE - M2022003
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022003
>
2022-02-25_PERMIT FILE - M2022003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 7:35:58 AM
Creation date
3/1/2022 1:39:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022003
IBM Index Class Name
Permit File
Doc Date
2/25/2022
Doc Name Note
enclosed Cost Estimate
Doc Name
Adequacy Review #2
From
DRMS
To
Travis Rock Construction Company of Colorado, LLC
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br /> Task description: Rip stockpile and pit <br /> Site: Stoker Borrow Pit Permit Action: 111Permit Permit/Job#: M2022003 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 2/15/2022 County: Kiowa Filename: M003-003 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU Horsepower: 310 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.46 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper Ownership Cost/Hour: $15.19 NA <br /> Ripper Operating Cost/Hour: $9.94 100 <br /> Operator Cost/Hour: $41.30 NA <br /> Total Unit Cost/Hour: $261.52 <br /> Total Fleet Cost/Hour: $261.52 <br /> Selected estimating method: Area <br /> MATERIAL QUANTITIES <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 9.23 acres Rip Depth(ft): 0.50 Volume: 7,446 BCY or CCY <br /> Source of estimated quantity: Site maps,reclamation plan <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 0.50 feet/pass <br /> Average Ripping Width: 7.08 feet/pass <br /> Average Ripping Length: 985.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.839 acres/hour <br /> Stoker Borrow Pit CIRCES Cost Estimating Software <br /> 2022 February <br />
The URL can be used to link to this page
Your browser does not support the video tag.