Laserfiche WebLink
MOTOR GRADER WORK <br /> Task description: Fine Grading <br /> Site: Stoker Borrow Pit Permit Action: 111Permit Permit/Job#: M2022003 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 2/15/2022 County: Kiowa Filename: M003-002 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 12M Horsepower: 158 <br /> Ripper Attachment: Multi-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $47.01 NA <br /> Operating Cost/Hour: $37.67 100 <br /> Ripper Ownership Cost/Hour: $2.95 NA <br /> Ripper Operating Cost/Hour: $3.40 100 <br /> Operator Cost/Hour: $28.56 NA <br /> Total Unit Cost/Hour: $119.59 <br /> Total Fleet Cost/Hour: $119.59 <br /> MATERIAL QUANTITIES <br /> Total Area to be graded or ripped: 9.23 acres <br /> Source of estimated acreage: Disturbed acreage in reclamation plan permit application, <br /> HOURLY PRODUCTION <br /> Average Grader Speed: 1.50 mph <br /> Selected Application: Finish grading(0-2.5 mph)- 1.5 <br /> Selected Blade Angle: 0 degrees <br /> Effective Blade Length: 12.00 feet <br /> Width of blade overlap per pass: 2.00 feet <br /> Net grading or ripping width per pass: 10.00 feet <br /> Unadjusted Hourly Unit Production: 1.8182 acres/hour <br /> Job Condition Correction Factors Site Altitude:4250 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.85 (1sh/d,mod.) <br /> Net Correction: 0.8500 multiplier <br /> Adjusted Hourly Unit Production: 1.5455 acres/Hour <br /> Adjusted Hourly Fleet Production: 1.5455 acres/Hour <br /> Stoker Borrow Pit CIRCES Cost Estimating Software <br /> 2022 February <br />