My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-25_PERMIT FILE - M2022003
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022003
>
2022-02-25_PERMIT FILE - M2022003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 7:35:58 AM
Creation date
3/1/2022 1:39:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022003
IBM Index Class Name
Permit File
Doc Date
2/25/2022
Doc Name Note
enclosed Cost Estimate
Doc Name
Adequacy Review #2
From
DRMS
To
Travis Rock Construction Company of Colorado, LLC
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br /> Task description: Fine Grading <br /> Site: Stoker Borrow Pit Permit Action: 111Permit Permit/Job#: M2022003 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 2/15/2022 County: Kiowa Filename: M003-002 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 12M Horsepower: 158 <br /> Ripper Attachment: Multi-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $47.01 NA <br /> Operating Cost/Hour: $37.67 100 <br /> Ripper Ownership Cost/Hour: $2.95 NA <br /> Ripper Operating Cost/Hour: $3.40 100 <br /> Operator Cost/Hour: $28.56 NA <br /> Total Unit Cost/Hour: $119.59 <br /> Total Fleet Cost/Hour: $119.59 <br /> MATERIAL QUANTITIES <br /> Total Area to be graded or ripped: 9.23 acres <br /> Source of estimated acreage: Disturbed acreage in reclamation plan permit application, <br /> HOURLY PRODUCTION <br /> Average Grader Speed: 1.50 mph <br /> Selected Application: Finish grading(0-2.5 mph)- 1.5 <br /> Selected Blade Angle: 0 degrees <br /> Effective Blade Length: 12.00 feet <br /> Width of blade overlap per pass: 2.00 feet <br /> Net grading or ripping width per pass: 10.00 feet <br /> Unadjusted Hourly Unit Production: 1.8182 acres/hour <br /> Job Condition Correction Factors Site Altitude:4250 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.85 (1sh/d,mod.) <br /> Net Correction: 0.8500 multiplier <br /> Adjusted Hourly Unit Production: 1.5455 acres/Hour <br /> Adjusted Hourly Fleet Production: 1.5455 acres/Hour <br /> Stoker Borrow Pit CIRCES Cost Estimating Software <br /> 2022 February <br />
The URL can be used to link to this page
Your browser does not support the video tag.