Laserfiche WebLink
SCRAPER TEAM WORK <br /> Task description: Topsoil spreading <br /> Site: Stoker Borrow Pit Permit Action: 111Permit Permit/Job#: M2022003 <br /> PROJECT IDENTIFICATION <br /> Task#: 008 State: Colorado Abbreviation: None <br /> Date: 2/23/2022 County: Kiowa Filename: I I I -Permit <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 627G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance-Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker,5,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 25 25 25 25 <br /> Ownership cost/hour: $188.81 NA $97.46 $97.46 $85.80 $33.45 <br /> Operating cost/hour: $169.82 NA $24.41 $24.41 $15.10 $10.49 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Ripper op.cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $30.90 NA $41.30 $41.30 $28.56 $27.55 <br /> Unit Subtotals: $389.53 NA $163.17 $163.17 $129.46 $71.49 <br /> Number of Units: 2 0 1 1 1 1 <br /> Group Subtotals: Work: $779.06 Support: $326.34 Maint: $200.95 <br /> Total work team cost/hour: $1,306.35 <br /> MATERIAL QUANTITIES <br /> Initial volume: 7,446 CCY Swell factor: 1.000 <br /> Loose volume: 7,446 LCY <br /> Source of estimated volume: Application <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,100 lbs/LCY Struck Volume: 15.70 LCY <br /> Material description: Earth-Loam Heaped Volume: 22.00 LCY <br /> Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br /> Payload Capacity: 25.14 LCY Adjusted Capacity: 18.85 LCY <br /> Stoker Borrow Pit CIRCES Cost Estimating Software <br /> 2022 February <br />