Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#03A Page 3 of 3 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 800.00 5.00 5.00 10.00 1068 0.763 <br /> Haul Time: 0.763 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 800.00 -5.00 5.00 0.00 2938 0.300 <br /> Return Time: 0.300 minutes <br /> Total Truck Cycle Time: 3.293 minutes <br /> Loading Tool unit <br /> Production 415.38 LCY/Hour Adjusted for job efficiency: 344.77 LCY/Hour <br /> Truck Unit Production <br /> 180.38 LCY/Hour Adjusted for job efficiency: 149.72 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 299.44 LCY/Hour <br /> Adjusted single truck/loader team production: 299.44 LCY/Hour <br /> Adjusted multiple truck/loader team production: 299.44 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 54.01 Hours <br /> Unit cost: $0.682 /LCY Total job cost: $11,023 <br /> CIRCES Cost Estimating Software <br />