Laserfiche WebLink
Page 1 of 3 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Transport topsoil material <br /> Site: Bradbury Pit Permit Action: 2022 Permit/Job#: M1978357 <br /> PROJECT IDENTIFICATION <br /> Task#: 03A State: Colorado Abbreviation: None <br /> Date: 2/28/2022 County: Mesa Filename: M357-03a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 8-10 cy,6x4 <br /> -Loader: CAT 928Hz <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA NA NA NA <br /> Ownership cost/hour: $18.14 $30.09 NA NA NA NA <br /> Operating cost/hour: $35.95 $29.87 NA NA NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA NA NA <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $0.00 $35.97 NA NA NA NA <br /> Unit Subtotals: $54.09 $95.93 NA NA NA NA <br /> Number of Units: 2 1 0 0 0 0 <br /> Group Subtotals: Work: $204.11 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $204.11 <br /> MATERIAL QUANTITIES <br /> Initial volume: 13,310 CCY Swell factor: 1.215 <br /> Loose volume: 16,172 LCY <br /> Source of estimated volume: Half of total topsoil 6"over 33 acres <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(weight)Basis: <br /> Material weight: 1,600 Pounds/LCY <br /> Description: Top Soil <br /> Rated Payload: 27,280 Pounds <br /> Payload Capacity: 17.05 LCY <br /> CIRCES Cost Estimating Software <br />