Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Secondary mobilization <br /> Site: Bradbury Pit Permit Action: 2022 Permit/Job#: M1978357 <br /> PROJECT IDENTIFICATION <br /> Task#: 06B State: Colorado Abbreviation: None <br /> Date: 2/28/2022 County: Mesa Filename: M357-06b <br /> User: ACY <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $21.28 $37.94 $47.67 <br /> Operating Cost/Hour: $26.55 $50.48 $56.21 <br /> Operator Cost/Hour: $20.54 $20.54 $20.54 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $68.37 $132.49 $147.95 <br /> NON ROADABLE EQUIPMENT, <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Drill/Broadcast 25.00 $7.98 $68.37 1 $76.35 $68.37 $250.00 <br /> Seeder with <br /> Tractor <br /> Power Mulcher 6.00 $14.98 $68.37 1 $83.35 $68.37 $250.00 <br /> (Bowie LD-90 <br /> Subtotals: 1 $159.70 $136.74 $500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4A, 1 T. $48.74 1 $48.74 $48.74 <br /> Crew <br /> Subtotals: $48.74 $48.74 <br /> CIRCES Cost Estimating Software <br />