My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-28_REVISION - P2021004
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2021004
>
2022-02-28_REVISION - P2021004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:41:03 PM
Creation date
3/1/2022 8:55:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2021004
IBM Index Class Name
Revision
Doc Date
2/28/2022
From
GRE Inc
To
DRMS
Type & Sequence
MD1
Email Name
LJW
THM
SMS
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Describe the measures to be taken for release of a reportable quantity of a hazardous material <br /> or the release of a toxic substance. This includes plans for spill prevention, containment, <br /> notification, and cleanup. <br /> NA. No Hazardous material will be kept/stored on site. <br /> H. Reclamation. Describe the annual and final reclamation standards based on the anticipated <br /> schedule for construction, operations, and project closure. Include such items as the removal of <br /> structures and facilities including bridges and culverts, a revegetation plan, permanent containment <br /> of mine tailings, waste, or sludges which pose a threat of a release into the environment, closing <br /> ponds and eliminating standing water, a final surface shaping plan, and post operations monitoring <br /> and maintenance plans. <br /> Reclamation will be placing removed portal dirt back into the Portal before the end of calendar <br /> year 2022. <br /> (Please see attached modification overview for updated plans) <br /> VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br /> A. Required changes/modifications/special mitigation for plan of operations: <br /> #1. The name and legal mailing address of operators, and their lessees, assigns, or designees. <br /> (see attached) <br /> #2. A map or sketck showing information sufficient to locate the proposed area of operations on <br /> the ground, existing/or proposed roads or access routes to be used in connection with <br /> the operations and the approximate location and size of areas where surface resources will be <br /> disturbed. (see attached) <br /> #3. A detailed action plan and overview of our assesent and action plan for if water is <br /> Discovered while opening the portal entrance documented. (see attached) <br /> (If more space is needed to fill out a block of information,use additional sheets and attach form) <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.