Laserfiche WebLink
B. Water Quality. State how applicable state and federal water quality standards will be met. <br /> Describe measures or management practices to be used to minimize water quality impacts and <br /> meet applicable standards. <br /> 1. State whether water is to be used in the operation, and describe the quantity, source, methods <br /> and design of diversions, storage, use, disposal, and treatment facilities. Include assumptions <br /> for sizing water conveyance or storage facilities. <br /> 2. Describe methods to control erosion and surface water runoff from all disturbed areas, <br /> including waste and tailings dumps. <br /> 3. Describe proposed surface water and groundwater quality monitoring, if required, to <br /> demonstrate compliance with federal or state water quality standards. <br /> 4. Describe the measures to be used to minimize potential water quality impacts during seasonal <br /> closures, or for a temporary cessation of operations. <br /> 5. If land application is proposed for waste water disposal, the location and operation of the land <br /> application system must be described. Also describe how vegetation, soil, and surface and <br /> groundwater quality will be protected if land application is used. <br /> #1. NA. Water is not being used for this operation. <br /> #2. NA. Waste and tailings are not being disturbed. <br /> #3. NA. We will not be working by any water source. <br /> #4. NA. We will not be working near any water source. <br /> #5. NA. No waste water disposal is required. <br /> (Please see attached modification overview &water action plans) <br /> C. Solid Wastes. Describe the quantity and the physical and chemical characteristics of solid waste <br /> produced by the operation. Describe how the wastes will be disposed of including location and <br /> design of facilities, or treated so as to minimize adverse impacts. <br /> No Solid wastes will be produced. <br /> D. Scenic Values. Describe protection of scenic values such as screening, slash disposal, or timely <br /> reclamation. <br /> Dirt will be removed from main portal entrance. No scenic values will be disturbed. <br /> Reclamation will be putting the said removed dirt back infront of the main portal entrance. <br /> (Please see attached modification overview for updated plans) <br /> (If more space is needed to fill out a block of information,use additional sheets and attach form) <br /> -5- <br />