Laserfiche WebLink
C. Project Description. Describe all aspects of the operation including mining, milling, and <br /> exploration methods, materials, equipment, workforce, construction and operation schedule, power <br /> requirements, how clearing will be accomplished, topsoil stockpile, waste rock placement, tailings <br /> disposal, proposed number of drillholes and depth, depth of proposed suction dredging, and how <br /> gravels will be replaced, etc. Calculate production rates of ore. Include justification and calculations <br /> for settling pond capacities, and the size of runoff diversion channels. <br /> Dirt has been piled in front of main entrance. We will remove the dirt to gain access to the main <br /> Adit door. Once the dirt is clear we will assess the condition of the door and remove as needed <br /> to gain access to inner workings. Once access is obtained we will verify the condition of <br /> interior <br /> and map the workings. We will insure the main entrence door is sufficient to keep general <br /> public <br /> from accessing workings. <br /> (Please see attached modification overview for updated plans) <br /> (If more space is needed to fill out a block of information,use additional sheets and attach form) <br /> -3- <br />