My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-28_REVISION - M1984001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984001
>
2022-02-28_REVISION - M1984001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2022 11:56:33 AM
Creation date
2/28/2022 11:48:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984001
IBM Index Class Name
Revision
Doc Date
2/28/2022
Doc Name Note
and Notice of Surety Increase
Doc Name
Reclamation Cost Update
From
DRMS
To
Jim Doody Kilgore Companies LLC dba Elam Construction
Type & Sequence
SI2
Email Name
ACY
THM
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Update post inspection 02-22-2022 <br /> Site: Surface Rock Pit Permit Action: 2022 Permit/Job#: M1984001 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 2/24/2022 County: Mesa Filename: ACY0000 <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 01a Rip and regrade Site A imprint area DOZER 1 76.15 $19,818 <br /> 02a Distribute 6"of topsoil over 4 acres of Site A DOZER 1 5.32 $1,251 <br /> 03a Reveg of 4 acres in Site A-highwall floor REVEGE 1 16.00 $7,312 <br /> 03b Failure Reveg of 2.5 acres Site A-eastern reclaim REVEGE 1 6.00 $3,047 <br /> area <br /> 04a Initial Mobilization MOBILIZE 1 3.95 $3,078 <br /> 04b Secondary Mobilization MOBILIZE 1 3.95 $1,657 <br /> SUBTOTALS: 111.37 $36,163 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $730 <br /> Performance bond: 1.05 Total= $380 <br /> Job superintendent: 0.00 Total= $0 <br /> Profit: 10.00 Total= $3,616 <br /> TOTAL O&P= $4,726 <br /> CONTRACT AMOUNT(direct+O&P)= $40,890 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0 <br /> Reclamation management and/or administration: 5.00 $2,044 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $7,271 <br /> TOTAL BOND AMOUNT(direct+indirect)= $43,434 <br />
The URL can be used to link to this page
Your browser does not support the video tag.