My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-28_PERMIT FILE - M2022003
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022003
>
2022-02-28_PERMIT FILE - M2022003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 5:35:01 AM
Creation date
2/28/2022 11:11:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022003
IBM Index Class Name
Permit File
Doc Date
2/28/2022
Doc Name
Adequacy Review Response
From
CRCC
To
DRMS
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D - Reclamation Plan <br /> Rule 6.3.4 <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will <br /> be used to reclaim the affected land to the proposed future land use. This plan must be correlated to <br /> Exhibit E - Map. <br /> 1) Primary future (Post-mining) land use (check one): <br /> F Cropland (CR) F1 Pastureland(PL) General Agriculture (GA) <br /> R✓ Rangeland (RL) Forestry (FR) Wildlife Habitat (WL) ** <br /> F Residential (RS) Recreation (RC) Industrial/Commercial (IC) <br /> F Developed Water Resource (WR) <br /> "Note: The Colorado Parks & Wildlife (CPW) must be consulted where wildlife use is the <br /> proposed future land use. <br /> 2) Please provide a general description of how the mined area will be reclaimed: <br /> Following mining operations all slopes will be graded to conform to 4:1 or shallower, and made <br /> to drain, then topsoil will be re-spread to cover any areas of disturbance. Following topsoil <br /> spreading the disturbed areas will be ripped and seeded, including any previous stockpile <br /> areas.No overburden material is anticipated bu if encountered overburden win be spread <br /> evenly across the site prior to topsall placement. <br /> 3) Specify which ponds, streams, roads and buildings, if any, will remain after reclamation. <br /> These features must be shown on the Exhibit E- Map: <br /> All existing roads, and structures will remain following reclaimation. <br /> Note: if ponds are a part of the Reclamation Plan, slopes from 5 vertical feet above to 10 <br /> vertical feet below the expected average water level cannot be steeper than 3HA V; remaining <br /> slope lengths may not be steeper than 2H:1 V (see example sketch below). <br /> .................................................................... <br /> 5' <br /> I <br /> 10, 1 <br /> 3 <br /> .y....................................................................._....................._.............._....._..._....................................................................................... <br />
The URL can be used to link to this page
Your browser does not support the video tag.