My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-13_GENERAL DOCUMENTS - C1980007 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2021-10-13_GENERAL DOCUMENTS - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2022 10:05:32 AM
Creation date
2/25/2022 9:52:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/13/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Mountain Coal Company, LLC
Type & Sequence
SL13
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II E3-63,E3-61,E3-59 E-seam MVB USFS 0.53 2014 SL-8 <br /> II E3-55&Access Road E-seam MVB USFS 0.54 2014 SL-8 <br /> II E3-47&Access Road E-seam MVB USFS 0.68 2014 SL-8 <br /> II E3-44&Access Road E-seam MVB USFS 1.31 2014 SL-8 <br /> II E3-40 E-seam MVB USFS 0.51 2014 SL-8 <br /> II E3-36&Access Road E-seam MVB USFS 0.49 2014 SL-8 <br /> II E3-32.5 &Access Road E-seam MVB USFS 0.81 2014 SL-8 <br /> II E3-25 E-seam MVB USFS 0.54 2015 SL-10 <br /> II E3-21 E-seam MVB USFS 0.32 2015 SL-10 <br /> II E3-17.5 E-seam MVB USFS 0.58 2015 SL-10 <br /> II E3-12&Access Road E-seam MVB USFS 0.88 2015 SL-10 <br /> II E4-1,E4-2,E4-3 E-seam MVB USFS 1.65 2015 SL-10 <br /> II E4-4&Road Spur E-seam MVB USFS 0.53 2015 SL-10 <br /> II E4-5,E4-6&Road Spur E-seam MVB USFS 0.63 2015 SL-10 <br /> II E4-7,E4-8&Access Road E-seam MVB USFS 1.15 2015 SL-10 <br /> II E4-9 E-seam MVB USFS 0.39 2015 SL-10 <br /> II E4-10 E-seam MVB USFS 0.61 2015 SL-10 <br /> II E4-11&Access Spur E-seam MVB USFS 1.06 2015 SL-10 <br /> II E4-12&Access Spur E-seam MVB USFS 0.25 2015 SL-10 <br /> II E4-13&Access Spur E-seam MVB USFS 0.75 2015 SL-10 <br /> II E4-68 E-seam MVB USFS 0.82 2012 SL-5 <br /> II E4-14 E-seam MVB USFS 0.61 2015 SL-10 <br /> II E4-80.5,81.5,83 E-seam MVB USFS 0.36 2012 SL-5 <br /> Total acreage for SL-13 50.04 <br /> II. CRITERIA AND SCHEDULE FOR BOND RELEASE <br /> PHASE II <br /> Rule 3.03.1(2)(b) states, "Up to eighty-five percent of the applicable bond amount shall be released upon <br /> the establishment of vegetation which supports the approved postmining land use and which meets the <br /> approved success standard for cover... based on statistically valid data collected during a single year of <br /> the liability period". In regard to Phase II bond release, Rule 3.03.2(3)(b) also states, "No more than <br /> sixty(60)percent of the bond shall be released so long as the lands to which the release would be <br /> applicable are contributing suspended solids to streamflow or runoff outside the permit area in excess of <br /> premining levels as determined by baseline data or in excess of levels determined on adjacent nonmined <br /> areas". <br /> With regard to Phase II bond release, details of the approved reclamation plan are given in section 2.05.4 <br /> of the Permit Application Packet(PAP) and in Exhibit 80. The reclamation plan applicable to the sites <br /> included in the SL-13 application calls for"stored topsoil [to] be distributed as evenly as possible over <br /> the disturbed pad area", and for"the entire drill pad area [to] be re-seeded using an approved USFS seed <br /> mix". <br /> The vegetative cover success standard is given in section 2.05.4 of the permit application package(PAP) <br /> (page 2.05-69). It states that: <br /> For total vegetation cover on reclaimed areas, the revegetation success criterion is 53.04 <br /> C-1980-007 Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.