Laserfiche WebLink
LKA Gold Incorporated <br /> 3724 47th Street Ct RECEIVED <br /> Gig Harbor, WA 98335 RE <br /> (253) 514-6661 <br /> www.lkagold.com FEB 2 32022 <br /> DIVISION MINING AND�EN TMIO <br /> February 18, 2022 <br /> Lucas West <br /> Environmental Protection Specialist <br /> Minerals Program, DRMS <br /> 1001 E 62nd Avenue, Room 215 <br /> Denver CO 80216 <br /> RE: Golden Wonder Mine—January Site Monitoring Report 2022 <br /> Mr. West, <br /> As I previously reported to you via email, site conditions at the mine (6 Level Pad)are <br /> completely frozen. <br /> Overnight temperatures have, during the month, often been in the low single digits. Both <br /> ponds on the pad (stormwater reservoir& minewater reservoir) have not changed in terms of <br /> capacity levels since you were on site last December. See attached pictures. <br /> This weekend, for the first time, we have a local person flying his drone over the site to give <br /> us pictures. I expect no significant change until things start warming up. We will provide these <br /> pictures in our February report. <br /> As of this writing, we still have not received the MLRB ruling with specific instructions <br /> concerning monthly reporting....dates due, where to send, format, etc. This is something we <br /> were anticipating in January. Regardless, in an effort to remain in compliance with our verbal <br /> commitment made at the MLRB hearing last December, we're providing this report for <br /> January 2022, (our first) and will continue reporting site conditions for each month by the 10th <br /> day of the following month, in this format, unless/until instructed otherwise. <br /> Please confirm (email is best)that you received this in good order and let me know promptly if <br /> you have any questions or concerns. <br /> Sincerely, <br /> Ah*- <br /> Kye Abraham 1"11-49.10 <br /> President (Digitally signed and time stamped) <br />