My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-23_PERMIT FILE - M2021059 (13)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021059
>
2022-02-23_PERMIT FILE - M2021059 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2025 5:12:23 AM
Creation date
2/23/2022 9:33:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021059
IBM Index Class Name
Permit File
Doc Date
2/23/2022
Doc Name
Adequacy Review Response
From
Telesto
To
DRMS
Email Name
JLE
PSH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: Mr. Peter Ha�S <br /> Date: February 21. 2022 <br /> Page 6 <br /> Comment 15 <br /> Pursuant to Rule 6.4.5()g(iii), please provide a description of the fertilization to be <br /> implemented during reclamation, if applicable, and specify the types, mixtures, quantities <br /> and time of application. <br /> Response 15 <br /> LRM plans not to use fertilizer as our agronomist recommends against its use when <br /> establishing native vegetation. <br /> Comment 16 <br /> On Page 16, Section 7.4.2, the Applicant states grass or straw will be crimped in place <br /> with a mechanical crimper made for such purposes or using a farm-type disc plow set <br /> straight with adequate weigh to crimp the material to a depth of approximately 4 inches. <br /> Please provide the tons per acre of mulching proposed during reclamation. <br /> Response 16 <br /> Mulch will be applied at a minimum rate of approximately one ton per acre. For slopes <br /> exceeding 5V:1H, mulch will be applied at a minimum rate of approximately 2 tons per <br /> acre. <br /> Comment 17 <br /> Please provide a Weld County approved Noxious Weed Management Plan including at <br /> minimum the target species, mitigation measures and treatment schedule. <br /> Response 17 <br /> Please see Attachment 7 for the Weed Inventory, Monitoring, and Control Plan for Dunn <br /> Pit. As a note, Weld County Weed Division does not require approval of this plan. <br /> 6.4.5 Exhibit F- Reclamation Plan Map <br /> Comment 18 <br /> On Exhibit F-1, Section A-A., the Applicant indicates a final reclamation slope of 1.5H.•1 V <br /> below the water line and 3H.•I V above the waterline. As noted in Item #12,please commit <br /> to reclaiming the pond slopes at a 3H:1 V grade from 5 feet above to 10 feet below the <br /> expected water line and revise Exhibit F-1 accordingly. <br /> Additionally, in the proposed Reclamation Plan the Applicant states slopes of 3H:1 V will <br /> be established above the water surface and slopes of 2H:1 V will be established at or below <br /> the water surface. Please explain this discrepancy and revise Exhibit F-1 accordingly. <br /> 20220209_1O45_DRMS_Adequacy Review_Response_MASTE <br /> R.docx TELESTG <br />
The URL can be used to link to this page
Your browser does not support the video tag.