Laserfiche WebLink
To- Nlr. Peter Hays <br /> Date: February 21, 2022 <br /> Page 4 <br /> Comment 9 <br /> On Page 12, Section 7.0, the Applicant states the backfilling and sloping sides of mining <br /> cells with excess topsoil will occur during reclamation. Please explain the earthmoving <br /> processes the Applicant intends to implement to backfill and compact the mined slopes and <br /> shorelines with topsoil during reclamation. <br /> Response 9 <br /> LRM will either tram or truck-haul topsoil to its location for placement. They will grade <br /> material out with a track mounted dozer to the water's edge. Utilizing the same track-hoe <br /> utilized for mining, an experienced operator will push/place material at the proper grade <br /> below the water's surface. LRM will also take advantage of the fluctuating groundwater <br /> table to push material beneath the water surface at the lowest groundwater elevation of the <br /> season. Once mining of a cell is complete, LRM will perform a bathymetric and verify <br /> compliance with the rule. <br /> Comment 10 <br /> On Page 12, Section 7.1, the Applicant states the Dunn Pit will be returned to a post-mining <br /> land use of wildlife habitat with groundwater sources ponds as each of the three phases <br /> are completed. Please commit to providing the Division with a copy of the final <br /> groundwater augmentation plan approved by the Division of Water Resources (DWR), <br /> when available. <br /> Response 10 <br /> LRM will provide the Division a copy of the final Augmentation Plan, once approved. <br /> LRM commits to use its Walters and Bokelman Pits site as the point of replacement <br /> (Decree 2009CWO105),which is already approved for augmenting the Dunn Pit site. LRM <br /> submitted a Gravel Pit Well Permit application and Substitute Water Supply Plan(SWSP) <br /> on September 1, 2021 to the DWR (invoice order #10256). The SWSP request covers <br /> January 2023 through December 2023 and describes estimated consumptive use from pit <br /> evaporation, dust suppression, aggregate entrainment, and reclamation vegetation <br /> establishment. The augmentation plan will include these components along with the water <br /> commissioner's shrink to move water down the Big Thompson. <br /> Comment 11 <br /> The Applicant has not obtained the final augmentation plan for the groundwater exposure <br /> of the three groundwater ponds at the conclusion of the Dunn Pit reclamation. Therefore, <br /> the Division will require the Applicant to provide a reclamation bond to include the <br /> backfilling of the exposed groundwater until the final augmentation plan is obtained from <br /> the DWR. The Division calculated the reclamation bond based on this requirement. <br /> 20220209_1045_DBMS_Adequacy_Revieiv_Response_MASTE <br /> R.docx TELEST® <br />