Laserfiche WebLink
To.- Mr. Peter Hays <br /> Date: Februarti' 21, 2022 <br /> Pa,,ie ;0 <br /> sampling equipment is used to collect samples. Please revise to reflect at least one rinsate <br /> sample will be collected during each sampling event as appropriate. <br /> Response 18 <br /> Section 7.2.2 in the revised Groundwater Sampling and Analysis plan reflects that one <br /> rinsate sample be collected each sampling event. <br /> Comment 19 <br /> As mentioned in #6 above, the Division will require at least five consecutive quarters of <br /> baseline water quality measurements with samples results compared to the most <br /> conservative values in Reg 41 Tables 1-4. Additionally, quarterly groundwater monitoring <br /> will continue for at least one year after the mining activities started at the site. After one <br /> year of mining the operator may, through a Technical Revision, request decreasing both <br /> the list of analytes samples are analyzed for and the frequency of monitoring. <br /> Response 19 <br /> Thank you for the clarification. LRM puts forth its intentions in this application to file <br /> such a revision at the appropriate time. We added language to clarify this point and <br /> acknowledge the regulatory process. <br /> Sincerely, <br /> Telesto Solutions,Inc. <br /> itAtWicco/Ii, PE <br /> Principal/Senior Engineer <br /> WLN:wsc <br /> Enclosure <br /> cc: <br /> 20220209_1045_DRMS_Adequacy Review_Response_HASTE <br /> R.docx TELEST® <br />