My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-23_PERMIT FILE - M2021059 (13)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021059
>
2022-02-23_PERMIT FILE - M2021059 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2025 5:12:23 AM
Creation date
2/23/2022 9:33:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021059
IBM Index Class Name
Permit File
Doc Date
2/23/2022
Doc Name
Adequacy Review Response
From
Telesto
To
DRMS
Email Name
JLE
PSH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To.- Mr. Peter Hays <br /> Date: Februarti' 21, 2022 <br /> Pa,,ie ;0 <br /> sampling equipment is used to collect samples. Please revise to reflect at least one rinsate <br /> sample will be collected during each sampling event as appropriate. <br /> Response 18 <br /> Section 7.2.2 in the revised Groundwater Sampling and Analysis plan reflects that one <br /> rinsate sample be collected each sampling event. <br /> Comment 19 <br /> As mentioned in #6 above, the Division will require at least five consecutive quarters of <br /> baseline water quality measurements with samples results compared to the most <br /> conservative values in Reg 41 Tables 1-4. Additionally, quarterly groundwater monitoring <br /> will continue for at least one year after the mining activities started at the site. After one <br /> year of mining the operator may, through a Technical Revision, request decreasing both <br /> the list of analytes samples are analyzed for and the frequency of monitoring. <br /> Response 19 <br /> Thank you for the clarification. LRM puts forth its intentions in this application to file <br /> such a revision at the appropriate time. We added language to clarify this point and <br /> acknowledge the regulatory process. <br /> Sincerely, <br /> Telesto Solutions,Inc. <br /> itAtWicco/Ii, PE <br /> Principal/Senior Engineer <br /> WLN:wsc <br /> Enclosure <br /> cc: <br /> 20220209_1045_DRMS_Adequacy Review_Response_HASTE <br /> R.docx TELEST® <br />
The URL can be used to link to this page
Your browser does not support the video tag.