My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-23_PERMIT FILE - M2021059 (13)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021059
>
2022-02-23_PERMIT FILE - M2021059 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2025 5:12:23 AM
Creation date
2/23/2022 9:33:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021059
IBM Index Class Name
Permit File
Doc Date
2/23/2022
Doc Name
Adequacy Review Response
From
Telesto
To
DRMS
Email Name
JLE
PSH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: fir. Peter Hays <br /> Date: Febwary 21, 20" <br /> Pa<-e 27 <br /> Comment 7 <br /> Did the applicant sample for radionuclides that are part of Reg 41 Table I? <br /> Response 7 <br /> We included uranium in the metals analyses, which in our experience is a good indicator <br /> in natural waters for other radiological components. Because there are no nearby, <br /> upgradient sources, uranium is naturally occurring on the Front Range, and LRM's <br /> activities include only mining,we anticipate sampling for uranium metal to be sufficient. <br /> Comment 8 <br /> Nitrate/Nitrite as N was sampled, Appendix B, in some wells but not others, why? <br /> Response 8 <br /> Nitrate/Nitrite as N was not sampled in some wells,due to miscommunication with the lab. <br /> Going forward, all groundwater samples will be tested for Nitrate/Nitrite as N, as well <br /> Nitrate as N and Nitrite as N. Please see updated sampling matrix in Table 2 in the revised <br /> Ground Water Sampling and Analysis Plan(Attachment 16). <br /> Comment 9 <br /> Nitrate, Nitrite, and Total Nitrate + Nitrite are Reg 41 Table 1 values that appear to have <br /> not been sampled in all wells,please comment. <br /> Response 9 <br /> Nitrate/Nitrite as N was not sampled in some wells,due to miscommunication with the lab. <br /> Going forward, all groundwater samples will be tested for Nitrate/Nitrite as N, as well <br /> Nitrate as N and Nitrite as N. Please see updated sampling matrix in Table 2 in the revised <br /> Ground Water Sampling and Analysis Plan(Attachment 16). <br /> Comment 10 <br /> The Division recognizes there will become a point when a reduction in groundwater level <br /> and quality monitoring frequency becomes reasonable. The reduction requests and <br /> approvals will be completed through submittal of a Technical Revision. <br /> Response 10 <br /> Thank you for the clarification. LRM puts forth its intentions in this application to file <br /> such a revision at the appropriate time. We added language to clarify this point in the <br /> revised Groundwater Sampling and Analysis Plan(Attachment 16) <br /> 20220209 1045_DBMS_Adequaey_Review_Response_MASTE <br /> R.docx TELEST© <br />
The URL can be used to link to this page
Your browser does not support the video tag.