Laserfiche WebLink
Exhibit G-Water information. <br /> Areas within the affected lands have no active rivers or streams.The topological shows the presence of <br /> a possible stream location adjacent to the existing pit area,yet historically no water has flowed from <br /> those areas into the permitted pit. If water were to pond and/or flow in this area and affect the <br /> permitted pit, berms will be constructed to prevent this issue. Historically,the only surface water comes <br /> from the minimal amount of rain in the region which is readily absorbed by the sand and gravel makeup. <br /> Ponding in the pit will be prevented by grading and/or filling low areas if the ground does not absorb it <br /> in a timely manner. <br /> It is not expected to encounter any ground water in this operation. <br /> There will be no requirements for water in this operation. <br />